Project

110-/380-kV high-voltage overhead line from Königsholz to the Steingraben substation, including dismantling and re-stringing work

As part of the effort to adapt the 380-kV extra-high-voltage grid to the growing demands of the energy transition, a new power interconnection is being built between the Gütersloh (North Rhine-Westphalia) and Lüstringen (Lower Saxony) substations. The goal of the project is to reliably and efficiently integrate the growing amounts of renewable energy—particularly wind energy—into the transmission grid.

The overall project is divided into three permitting sections. The first section between Gütersloh and Hesseln was completed in 2021. The second section, from Hesseln to the North Rhine-Westphalia/Lower Saxony state border near Königsholz, is currently under construction and is scheduled for completion by April 2026.

Construction Lot 2 includes the construction of a new approximately 8.7-km-long 110/380-kV overhead line in the Allendorf–KÜS Steingraben section, as well as the dismantling of several existing 110/220-kV and 30/110-kV lines.

In addition, some existing conductor cables will be reused, new 110-kV line sections will be constructed, and various re-stringing and new stringing measures will be carried out.

The expansion of the line will increase transmission capacity in the grid and make an important contribution to a secure energy supply as well as to the integration of renewable energy sources.

Project Area

Freileitung DE


Project Start

05.2026


Project End

11.2027


Client

Amprion


Indicators

• Construction of a new 110/380-kV overhead line approximately 8.7 km long
• Dismantling of a 110/220-kV line approximately 10.3 km long
• Dismantling of a 30/110-kV line approximately 7.0 km long
• Construction of two 110-kV line sections using existing conductors.
• Conducting conductor replacement and installation work on sections approximately 0.2 km long each.