Project

Himberg train station

An infrastructure development analysis conducted by ÖBB-Infrastruktur AG found that the capacity of the existing transportation infrastructure has been largely exhausted, particularly due to strong population growth in the Vienna metropolitan area. Because of the significantly increased demands on the rail infrastructure, a comprehensive renovation of Himberg station is necessary, which will also include the construction of two island platforms.

Consequently, in the summer of 2024, EUROPTEN was commissioned to renovate and expand the functionality of the overhead contact line system at Himberg Station. As part of this project, the station will be extended on both sides and widened with additional tracks in a total of 64 construction phases, all while rail operations continue. Due to space constraints, a total of 15 transverse support structures ranging in length from 28 m to 37 m were constructed in the central area of the station. EUROPTEN began work on the overhead contact line system on November 5, 2024; the project is scheduled for completion in December 2026.

Project Area

Fahrleitung AT


Project Start

11.2024


Project End

12.2026


Client

ÖBB Infrastruktur AG


Indicators

Transverse structures: 15
Overhead line poles: 165
1,600 m of Type 1.1 catenary
3,000 m of Type 1.2 catenary
7,000 m of Type 1.3 catenary
18,000 m of live and return conductors